Wednesday 6 January 2016

Projects list updated January 2016




Just some of our completed projects, values and where we have worked to give an idea of the variety of our work.

1. (ICS) Priory House, Grade 2 listed Building Dudley, Complete design & Re-wire, Value £21’825.00

2. (ICS) The White House, Grade 2 listed building Dudley, Complete design & Re-wire, Value £16’789.00

3. (Hadley Industries) Structural Sections, Steel factory Oldbury, Complete New fire alarm & Re-wire to two   storey office block & Mains to new factory, Value £52’381.00

4. (Hadley Industries) Roll Form, Steel factory Smethwick, Refurbishment to office area, design & install Wiring and office partitioning, Value £32’813.00

5. (ICS) Premier Inn, Southampton Airport, New Air con supplies to every room, Value £30’158.00

6. (ICS) Premier Inn, Southampton Central, New Air con supplies to every room, Value £61’592.00

7. (ICS) Premier Inn, Putney Bridge-London, New Air con supplies to every room, Value £58’052.00

8. (Hadley Industries) Steel Factory Smethwick, Complete Re-wire including new 11kv Sub to new premises (bays 7, 8 & 9) Value £173’257.00

9. (Alpha Manufacturing) Bri-Stor, Factory re-location Stafford, New mains supplies and Re-wire office block, Value £63’171.00

10. (Alpha Car’s) Relocating offices in Portsmouth into new building, New mains, lighting design, data and phone systems and Fire alarms. Value £56’692.00

11. (Subway) New store at the NEC in Birmingham including front and rear of store complete installation of electric supplies and lighting. Value £3787.00

12. (Eastern Oven) New store at the NEC in Birmingham, Indian, Chinese and Italian cuisine. Complete new install of Lighting and power. Value £11’679.00

13. (West Midlands Police) rewire and various alterations to Bloxwich police station near Walsall. Mainly Lighting and small power alterations to suit new room layouts, Value £19’194.00

14. (Subway) New store in Chelmsford Essex, front and rear of shop installations, value £7607.00

15. (Greggs) New store in Headington (Oxford), complete new rewire for Lighting, Power, Fire alarms and Data. Value £5400

16. (Subway) Existing store Lighting overhaul in Taunton, Somerset. Lighting needed upgrading in a current store to bring it up to the other stores standards. Value £2800

17. (Subway), New store in Newcastle upon Tyne, Metrocentre, front and rear, value £5423.00

18. (Subway), New Subway Store in Chaddesden, Derby, front and rear, value £3228.00

19. (Twycross Zoo), Warwickshire, New lighting design to simulate sunrise/set in Elephant house, Value £2200.

20. (Hadley Structural Engineering) Oldbury, New Automatic heating controls in factory, Value £10’975.00

21. (Browns Restaurant) Worcester centre, complete gutting and revamp of restaurant, value £17692.58

22. (The Woodlodge), Gloucestershire, New offices to an Industrial warehouse, value £24.042.91

23. (Alexandra workwear new offices), Bristol complete building refurbishment, Value £175’000.00

24. (Alfred Dunhill), Bicester Village retail park, complete store refit from scratch, value £12305.00

25. (Subway), Holbron Hill, Birmingham, complete store refit from scratch, value £6311.96

26. (KTC Edibles), Wednesbury plant. Install new RCD weatherproof sockets for new production line, value £1462.12

27. (ERI Interiors), Oldbury. Install new power supply for new laser machine, value £3610.00

28. (Amethyst Group Logistics), Burton. Test and repair all light fittings on ground and first floor Mezzanine, value £1586.82

29. (National Spring), West Bromwich. Install New three phase supply for Press machine, value £378.74

30. (Coventry City Council), Install Fire alarm systems to 14 blocks of flats Bin Stores, value £4820.90

31. (Through a main contractor) Colmore Gate, Birmingham, Various floor’s refurbishment works Value £21’455.92

32. (Through a main contractor) Cheylemore House, Coventry, Ongoing refurbishment works in floor stages, value so far £55'334.00

33. (Through a main contractor) OAK Furniture Land, Cambridge, New store refit, including power, new lighting and fire alarms Value £25'000.00 

34. (Through Shopfitting contractor), Waterstones Bookstore, Dorchester, Strip out and re-install of new lighting, power and data throughout store. Value £13’423.63

35. (Through a main contractor) Victoria House, Victoria Square, Birmingham, Various floor office refurbishments including new lighting to match existing, underfloor power systems and new distribution boards Approx Value £97’000.00

36. (Through a main contractor) Unite the Union, Dagenham, Essex, supplying and installing new 3 compartment Dado trunking into office's to aid moving a company down in an office block, including sockets and data points, moving telephones and routers and testing. Value £4356.33

37. Wolverhampton College, Wolverhampton. Installing extra three phase circuits into the technology room with new isolator's and safety lock stop buttons installation to match existing style. Value £1511.00

38. (Through a main contractor) Skechers, Meadowhall shopping centre, Sheffield, Full Store refit, Value £23'250.00

39. The Tanning Shop, Stafford town centre, Rewire supplies to convert retail unit into tanning shop, all new supplies to sunbeds, adjust lighting to suit new layout, Value £2931.74

40. Industrial Steel plant, Bilston, Wolverhampton. Take down old HID Discharge floodlights from side of building and replace with new energy efficient 200watt LED floodlights controlled by presence detection. Value £4563.38

41. Walsall Adult and Community College, Full refurbishment of Reception and Kitchens, including all new LED lighting throughout, rewire of computer area's in reception and kitchen including single and three phase supplies. Value £12,704.70

42. (Through main contractor) Commercial office block, central Worcester, New Lighting including suspended lighting and recessed LED skytile's, Under floor power and Data trunking, Fire alarm adjustments. Value £25,784.99

43. (Through main contractor) Lush Store, Telford Shopping centre. Complete rewire installing new lighting supplied by client, to be installed on sensors and timers, Power and data for counter, Music system and adjustments to centre connected fire alarm. Value £4959.78


44. (Through a main contractor) Vodafone store new install, Swindon. Complete store refit turning the former Jessops store into a brand new Vodafone store in Swindon town Centre, Approx value £42’000.00

45. (Through a main contractor) Vodafone New store refit at One Stop shopping centre, Perry Barr, Birmingham. Approx value £28’000.00

46. (Through a main contractor) SK:N Clinic, Complete clinic Rewire including Power, New LED lighting, Fire alarm adjustments, Epsom, Surrey Approx value £16’000.00

47. (Through a main contractor) Barbour, complete Store Refit, Canary wharf, London. Approx value £10’000.00

48. (Through a main contractor) Power, new lighting & Data including 3 compartment skirting trunking in offices, Castle Dermot, Co. Kildare, Southern Ireland. Approx value £8’000.00

49. (Through a main contractor) Spar Store – help install a Subway area into the Spar at Blaenau Ffestiniog, Wales including rewire, install client provided lighting, and power for all new appliances, Approx value £4’500.00

50. School in West Bromwich – Dance studio refit, new mains distribution board, cable containment, new commercial style lights into a new suspended ceiling, extra sockets, stripping out of old equipment and cabling  - Approx value £4’600.00

51. School in West Bromwich – Power supply at rear entrance for new automated barrier system, including the digging up and re-laying of turf and tarmac across the rear drive, and the supply of armoured cable from one of the adjacent blocks – Approx value £3400.00


52. Supply of labour only at Jaguar Landrover, Solihull. Supplying various quantity teams to provide assistance with building various assembly lines over approximately a four month period, approximate cost £60’000.00

53. Monks and Crane Industrial Group – Change every single high bay lamp in main
warehouse, Distribution Centre, Wednesbury Cost £2300.00

54. Perryfields High School, Oldbury- 5 year EICR fixed wiring inspection (Split over two
years)

55. (Through a main contractor) Ford Showroom, Slough. Full re-fit including all
electrics, new internal and external lighting, showroom floor boxes, Data and telephone
points. Approx. value £24’000.00

56. (Through a main contractor) Ford Showroom, Crayford. Full re-fit including all
electrics and temporary electrics to site cabins, new internal and external lighting, showroom
floor boxes, Data and telephone points. Approx. value £40’000.00

57. (Through a main contractor) Ford Showroom, Gravesend. Full re-fit including all
electrics, new internal and external lighting, showroom floor boxes, Data and telephone
points. Approx. value £15’000.00

58. (Through a main contractor) Peacocks store refurbishment. Including store electrics,
till supplies, data, new lighting, P.A system and fire alarms. Lincoln. Approx. Value
£30’000.00

59. (Through a main contractor) The Mall. Walthamstow. Enabling works at the Mall,
ready for a new TK Maxx store, various enabling and temporary works and connections.
Approx. value £69’000.00

60. (Through a main contractor) Spar Store, Hagley. Installation of a Subway store in to
the rear of a Spar store, including new lighting and kitchen power supplies as required, new
mains distribution board and a few alterations to the main store. Approx. value £5000.00

61. (Through a main contractor) Spar Store, Castle Bromwich. Full shop re-fit including
new lighting, till supplies, various power and data connections. Approx. value £5’500.00

62. (Through a main contractor) Sherwood Park, Nottingham, Full commercial office
building refit, top to bottom new supplies, dis boards, floor boxes and trunking, lighting with
auto daylight controls, data, fire alarm - Approx. value £120’000.00

63. Hadley Industrial sections Ltd – Install New mains panel board in factory complete
with all new Steel wired armoured cables and cable trays along the length of the factory,
approx. cost £14’000.00

64. Spar Stores, Refit from standard shop to a Spar including all new LED client supplied
lighting, Data and power requirements, Cosford, - Approx value £6200.00

65. Post Office – Welland, complete rewire for main contractor including new consumer unit, new 600x600 LED panel lighting, new emergency lighting, power sockets throughout, disabled toilet alarm, smoke detectors and external lighting - value approx. £8800.00

66. George Salter Academy, West Bromwich, Complete refurbishment of the Kendrick
Block via a builder, including all new Lighting, power and Cat 6 cabling throughout, enabling works
and stripping out existing. Total approx. value £33’000.00

67. Spar store, Telford. Strip out works, install 21 x client supplied lights, power and data
for tills & Lotto. Approx. value £3800.00

68. Dudley Commercial Property, Complete rewire, new power and data circuits including
under floor power, LED tile lighting throughout, new Distribution boards, Flat screen TV’s
and aerials, disabled alarms, Fire alarm. Trade counter electric’s – Total approx. value
£59’000.00

69. Maverick TV, Birmingham, Complete rewire of building, including new lighting,
power, dado trunking, fibre data installation, board changes – Total – approx. £63’000.00

70. CIPFA offices, Great Charles Street, Birmingham – Refurbishment to a high standard
the 6th Floor for new occupancy, including new lighting, electrical systems and Cat 6 cabling.
Total approx. value - £41’000.00

71. Unite the Union, Ipswich, Various new power circuits, new lighting, lighting cabling and
switching adjustments, new LED emergency lighting and various other works to complete the
refurbishment. Approx. value £21’000.00

72. Greenford, Essex, commercial property – Power, lighting and fire alarm installation
works – Approx. value £18’000.00

73. Factory/Warehouse, Dudley, Strip out warehouse electrics, install new trays/trunkings
throughout the warehouse, LED Lighting throughout, new MCCB panel boards, New 3 phase

distribution boards, Complete re-wire – Approx. cost £115’000.00